Setting Anchors for the MV Saga at Woodfibre LNG

Setting Anchors for the MV Saga at Woodfibre LNG |

Setting Anchors for the MV Saga at Woodfibre LNG

Work commenced November 2025. Keltic Geomatics was contracted by Bridgemans to provide marine surveying and bathymetric surveying support for the arrival of the MV Saga Floating Hotel at Woodfibre LNG, Howe Sound, British Columbia.

Scope of Work

  • Drafting suitable anchor chain azimuths.
  • Deep water survey depth confirmation of the Howe Sound in British Columbia.
  • Confirmed and assisted in alignment of anchors and chains to protect sensitive eco-systems. Reporting confirmed all measures undertaken protected marine life.
  • Providing detailed post anchor installation location reports.

Project Gallery

Red anchor buoy being lifted by crane at Woodfibre LNG
Anchor buoy deployment at Woodfibre LNG
Setting Anchors for the MV Saga at Woodfibre LNG |
Night operations during anchor setting at Woodfibre LNG
Setting Anchors for the MV Saga at Woodfibre LNG |
Trimble GPS survey equipment and anchor chain on deck
You are currently viewing Setting Anchors for the MV Saga at Woodfibre LNG