Thornbury Facilities Terminal

Survey equipment getting a read on the terrain full of trees on a sunny day

Thornbury Facilities Terminal

(Wandering River, AB 2016)

Keltic was chosen to provide many services for the 2016 construction of a pipeline pump station near Wandering River, AB. The role that Keltic played was very diverse and the deadlines extremely tight, but thanks to hard work and long hours the project was a great success.

We came out and provided piling services, general layout, steel alignment, concrete form layout and anchor bolts, various as-built surveys, piping design, dirt work, drafting and more.

The role we played in this project was diverse and demanding, but Keltic and the project as a whole came out brilliantly. We are certainly proud of the job we’ve done because it’s helped yet another client work as efficiently as they possibly can.

We have years of experience in Oilfield construction so whatever you are building and wherever you build it, Keltic has got your team’s back.

Recent Projects

Vancouver Landfill

Back Vancouver Landfill King Hoe Excavating (Delta, BC 2020-2022) The ProjectThe Vancouver landfill in Delta BC is an impressive facility, managing many kinds of waste…

Gibraltar New Crusher Project

Gibraltar New Crusher Project

Back Gibraltar New Crusher Project Peterson Contrating (Williams Lake, BC 2022-2023) The Project Keltic was selected for surveying services for Gibraltar Mine’s new crusher installation…

Brucejack Mine New Heavy Shop

Brucejack Mine New Heavy Shop

Back Brucejack Mine New Heavy Shop CIF Construction (Golden Triangle, Stikine Region, BC 2022) The Project Keltic was chosen to perform accurate layout and asbuilts…